Ladywell Live
  • Local News
  • Community
    • Community Groups
    • Where to Eat/Drink
    • Other Local Businesses
    • Family Support – Resources
  • Local History
  • Ladywell Society
    • About Ladywell Society
  • Contact
  • Local News
  • Community
    • Community Groups
    • Where to Eat/Drink
    • Other Local Businesses
    • Family Support – Resources
  • Local History
  • Ladywell Society
    • About Ladywell Society
  • Contact
CommunityLocal News

10-year nature recovery plan and river restoration project drawn up for Ladywell Fields

by Tony July 22, 2026
July 22, 2026

Community volunteers have drawn up a 10 year nature recovery plan to make Ladywell Fields, already a much-loved and heavily used park, even better.

The proposals from park user group LFUG coincide with a project by Thames21, a leading London environmental charity, to launch the next phase of its work on restoring the River Ravensbourne.

The Ladywell Fields User Group will present a nature recovery plan, aimed at improving biodiversity and the ecological health of the park, at the Fields Cafe on August 1 2026 from 10.00am until 1.00pm.

The park was first mentioned in the Domesday Book of 1086 as  “30 acres of meadows in the Manor of Lewisham”. It became a  Site of Borough Importance for Nature Conservation after a major transformation 20 years ago when a channel of the Ravensbourne was diverted through the middle of the park. 

Since then, Ladywell Fields, has seen a series of initiatives  to increase leisure activities in the park and restore its natural character as  flood plain and water meadows.

Now the user group has drawn up a nature recovery plan “to coordinate the many ongoing  initiatives, stimulate ideas and take advantage of wider opportunities, including funding.”

“Last summer park users told us that what they most enjoyed about Ladywell Fields is contact with the natural world,” says Caroline Culpitt, chair of the user group.

” This inspired us to imagine an even more natural park, with more habitat for wildlife.

“Having consulted widely, we have come up with a ten year plan which we want to present back to park users.”

The key aims are:

  • Habitat and Species Improvement: Enhance habitat quality to boost the abundance of high-risk priority species and attract new wildlife like hedgehogs and water voles.
  • Connectivity: Strengthen river connections for both wildlife and people to the north and south of the park.
  • Water Restoration: Improve existing ponds, standing water, and the overall ecological health of the river.
  • Status Elevation: Transition the park toward a Site of Metropolitan Importance for Nature status.

Key Proposals

The non-statutory framework outlines 16 specific actions organised into six themes:

  • River and Ponds: Naturalise the river using bank reprofiling and berms, create a new channel and slope pond, and restore backwater habitats.
  • Trees and Hedges: Implement a dedicated “Plan for Trees” to mitigate climate risks and plant additional linear hedgerows.
  • Meadows and Insects: Expand meadow space and establish “insect islands” to support pollinators and beetles.
  • Community Engagement: Partner with neighbors to build hedgehog corridors and collaborate with local organizations on expanded wildlife monitoring surveys.
  • Communication: Promote awareness of the LFUG blog site and increase postings. Increase volunteer participation.Improve park signage.
  • Surveys: Work with partners to widen the  range of surveys, ideally to include  hedgehogs, bats, butterflies, stag  beetles, moths. Publish annual summary.

The user group plan coincides with Thames21’s Ravensbourne Restoration project. Thames21 works to transform London and the Thames Basin into a healthier, more climate-resilient region with rivers that everyone can enjoy.  

What do you think of the nature recovery plan. Feedback form here

On August 1 (10.00am to 1.00pm Fields Cafe) Thames 21 and the user group will present their river restoration project and nature recovery plan. Come and meet the local groups and volunteers.

green spacesLadywell FieldsLewisham CouncilLFUG
0 comment
0
FacebookTwitterWhatsapp
previous post
Local residents and tree lovers plan vigil to mourn the loss of 300 year old Mulberry tree at Ladywell House
next post
Award winning herbalist’s garden to find home in Ladywell by end of August

Related Posts

Big improvements planned at Glass Mill gym in...

August 9, 2026

Lewisham council uses mobile CCTV cameras to step...

August 8, 2026

Council asks shortlisted bidders to draw up detailed...

July 31, 2026

Completion of Lewisham’s new library delayed until autum...

July 30, 2026

Award winning herbalist’s garden to find home in...

July 28, 2026

Local residents and tree lovers plan vigil to...

July 20, 2026

Leave a Comment Cancel Reply

Save my name, email, and website in this browser for the next time I comment.

Ladywell Society News

Search the site

Sign up for our newsletter

Subscribe my Newsletter for new blog posts, tips & new photos. Let's stay updated!

Recent Tweets

Posts by LadywellLive

Tag cloud

Arts Assembly Brockley Brockley Max Business catford cemeteries community Coronavirus council Council cuts Crime cycling development environment FoBLC green spaces health high street Hilly Fields housing Ladywell Ladywell assembly Ladywell Fields Ladywell history Ladywell Society Lewisham Lewisham Council lewisham local Local business Local History Mike Guilfoyle Music NCIL planning Playtower police pollution safer neighbourhoods Schools shops street trees traffic transport Volunteering

Recent Comments

  • Howell on Lewisham one of worst performing inner London boroughs on healthy streets, says coalition scorecard
  • Madeleine Bracey on Know your neighbourhood: Ladywell from rural hamlet to Victorian London suburb
  • Lewisham seek to end development agreement at Ladywell Playtower - Murky Depths on Lewisham council to take control of Playtower after Guildmore fails to deliver
  • Catford Mews closes as Lewisham borough's only cinema repossessed - The Greenwich Wire on UPDATE – Council looks at applying for Heritage Lottery funding for Play Tower after developers Guildmore delay starting work amid rising costs
  • PL on Three projects – Ladywell Fields play area, Max in the Park, Christmas trees – recommended for NCIL funding

Categories

  • Assembly
  • Community
  • Featured
  • Ladywell Society
  • Local History
  • Local News
  • Neighbourhood
  • Slider
  • Top Stories
  • Uncategorized
  • Twitter
  • RSS

Privacy Policy
Designed and Developed by Catbytes

Read alsox

Mike Guilfoyle 1955-2023 – the engaging conversationalist with...

December 1, 2023

Neighbourhood notables 6: A leading social reformer, a...

December 13, 2019

Ladywell ward panel sets out three priorities for...

May 16, 2025
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.